online shoes store xkshoes,here check the latest yeezy shoes click here.

know more about 2020 nike and adidas soccer cleats news,check shopcleat and wpsoccer.

McDonald Group International, Inc

Water, Wastewater, Environmental Engineering 

 

Public Water Supply Well

 

This public water supply  well in Lake County was  designed and permitted by McDonald Group International to replace a failed water well.  The new well had to be drilled to meet both State and local requirements,  and had a capacity of 1700 gallons per minutet  The project also included conversion of the  disinfection system over from chlorination to chloramination in order to control disinfection byproducts

 .